Supply and Delivery of Low Voltage (LV) Power and Control Cables and Medium Voltage (MV) Power Cables to the Cape Coastal Cluster – Eastern Cape for over a period of Two (2) years on an “As and When required” basis.
Reference: ESKOM-E3541DXECOU-96284 | Status: closed
Department: Eskom — DISTRIBUTION
Province: Eastern Cape | Category: Energy & Utilities
Published: 15 September 2026 | Closes: 20 October 2026
Supply and Delivery of Low Voltage (LV) Power and Control Cables and Medium Voltage (MV) Power Cables to the Cape Coastal Cluster – Eastern Cape for over a period of Two (2) years on an “As and When required” basis. Location: East London Contact: matomas@eskom.co.za