Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on “as and when required basis” for period of 36 months (3 years).
Reference: ESKOM-E3558GXMPARN-96301 | Status: closed
Department: Eskom — GENERATION
Province: Mpumalanga | Category: Energy & Utilities
Published: 16 September 2026 | Closes: 13 October 2026
Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on “as and when required basis” for period of 36 months (3 years). Location: Arnot Power Station Contact: RamabuMM@eskom.co.za